
Finance
2027 City Budget
Help set priorities for next year’s budget before Council adopts the spending plan in November.
Citywide · Feedback by Sep 25
Official website of the City of Franklin, Ohio · (937) 555-0140

Engage Franklin
Learn what’s happening, share your feedback, and help shape what comes next.
Featured engagements

Finance
Help set priorities for next year’s budget before Council adopts the spending plan in November.
Citywide · Feedback by Sep 25

Parks and Recreation
A new park along the Great Miami River with trails, play, gathering space, and restored river edge.
Riverfront Park · Feedback by Sep 20

Public Works
Rebuilding Main Street from Second to Walnut with wider sidewalks, trees, lighting, and safer crossings.
Main Street, Downtown · Feedback by Sep 6
Explore what’s happening

Finance
Help set priorities for next year’s budget before Council adopts the spending plan in November.
Citywide · Feedback by Sep 25

Parks and Recreation
A new park along the Great Miami River with trails, play, gathering space, and restored river edge.
Riverfront Park · Feedback by Sep 20

Public Works
Rebuilding Main Street from Second to Walnut with wider sidewalks, trees, lighting, and safer crossings.
Main Street, Downtown · Feedback by Sep 6

Parks and Recreation
A proposed recreation center with a gym, pool, senior wing, and after-school space — still in the site and program phase.
Site to be determined

Public Works
Near-term safety work on Main Street: crossings, speed, lighting, and the places people feel least safe.
Main Street corridor · Feedback by Aug 30

Planning and Community Development
A 20-year plan for land use, housing, transportation, and the character of Franklin’s neighborhoods.
Citywide · Feedback by Oct 10
Map
Active projects are shown on the map. Open a pin for the project page, then comment, take a survey, or follow updates.
Pins are Franklin projects. Open Franklin on OpenStreetMap
Meetings and events
Closed loops
Public engagement is not finished when a survey closes. This is where the City reports what changed because residents spoke up.
You said
71% supported relocating parking
71% supported moving parking inland if trail access and a drop-off were kept.
We did
Parking will move to the existing overflow field. A 10-minute drop-off remains at the trailhead.
Why. The flood study found the current lot is in the floodway. Relocating it is required for restoration funding and reduces closures after high water.
Riverfront Park RedesignYou said
62% preferred Concept B
62% preferred Concept B: warmer pedestrian lighting along the sidewalk, with lower roadway fixtures. Residents also asked for lighting at the alley between Third and Fourth.
We did
The City selected Concept B and added a pedestrian light in the Third–Fourth alley. Roadway lighting will remain, at a lower height.
Why. Crash data showed two after-dark pedestrian incidents near Fourth Street. Sidewalk lighting was the highest-ranked night-safety request from residents and downtown employees who walk to their cars.
Downtown Streetscape ImprovementLatest updates
Downtown Streetscape Improvement
Survey extended through September 6At the request of downtown businesses, the streetscape survey will remain open through September 6. Paper copies are at City Hall and the library.
Main Street Safety Improvements
Temporary crossing at Fourth StreetA temporary marked crossing and signage were installed at Fourth and Main last week while the permanent design is completed.
Riverfront Park Redesign
Riverbank parking will move inlandThe flood study is complete. The existing 60-space lot along the river will be relocated. That decision is not being revisited; we are now asking how to use the recovered river edge.
Follow along
No account required. Unsubscribe any time. We send notices when a survey opens, a meeting is scheduled, or a decision is published.